sitebraid.

DATA CENTER CAMPUS DEVELOPMENT / TEXAS

Get your data center
campus

Multiple tenants. Multiple phases. One campus.

Resolve today’s power, water, approval and infrastructure-funding constraints. Coordinate the shared systems that multiple tenants and phases depend on.

For operators, developers and institutional capital
AI-generated campus visualization.

INTEGRATED CAMPUS DEVELOPMENT

One strategy for the systems that decide whether a campus moves.

We resolve the connected power, water, approval, infrastructure and capital decisions behind each phase.

Explore all capabilities

DELIVERY OUTCOMES

Remove the constraint.
Protect the investment.

01

Secure the route.

Turn uncertain provider, approval and infrastructure positions into an actionable path.

02

Align the capital.

Match ownership, funding and tenant commitments to the phase that needs to move.

03

Preserve the campus.

Resolve today’s blockage without consuming the capacity, land or operating flexibility required later.

Explore campus challenges

WHY SITEBRAID

High-stakes campus problems require more than another advisory report.

We assemble the disciplines the problem requires, take responsibility for the agreed scope and deliver a result the project can use.

About Sitebraid

TEXAS INTELLIGENCE

Decisions backed by depth.

Analysis of the jurisdiction, utility and capital structures shaping the next generation of Texas data center campuses.

OWNER TOOLKITS

Take the work with you.

Source-linked operating toolkits for decisions that cross buildings, tenants, infrastructure providers and phases. Each pack includes a handbook, a formula-driven workbook, editable forms and an evidence register.

PUCT 58481 owner readiness pack

A free owner-side guide to financial security, CIAC, customer-built interconnection facilities, TSP takeover and audit-ready documentation under adopted 16 TAC 25.194, effective October 8, 2026.

PGRR145 Batch Zero owner pack

A free owner-side guide to Batch Zero eligibility, attestations, TSP and DSP handoffs, study data, energization and audit-ready evidence under ERCOT PGRR145.

Infrastructure responsibility matrix

A practical owner-side matrix for assigning control, funding, approval, construction, operation and acceptance across shared Texas data center campus infrastructure.

Switchyard Drawdown Control Pack

A premium owner-side draw request, monitoring, cost-to-complete, schedule-control and future-funding template for customer-built or build-transfer switchyards.

TWDB water-survey checklist

A one-page fillable checklist for owners and capital partners reading the September 14 TWDB survey-enforcement letter after its October 14, 2026 Governor update deadline passed. Seven Decision / Y/N / Owner rows. Editorial checklist only.

See all resources

Start with the decision
that cannot wait.

Send the location, current stage, exposed commitment and result required. We will determine whether Sitebraid is the right team for the problem.

Discuss your project